Project Information


Location: Konya, Turkey


Client: General Directorate of Highways


Project Length: 59.8 KM Ring Road (2×3 Lanes)


Tunnels: 6 Tunnels with a Total Length of 5725 Meters


Bridges: 13 Bridges


Viaducts: 14 Viaducts


Intersections: 19 Multilevel Interchanges


Dams and Ponds Highways and Roads Tunnels and Bridges Irrigation and Drainage Energy Survey Services

2021 © PETEK PROJE MUHENDİSLİK MÜŞAVİRLİK A.Ş TÜM HAKLARI SAKLIDIR